13609623361@139.com
+8675526585726
Articles
Articles

Home Articles From design to implementation: full process management of charging interface plug-in life test system

From design to implementation: full process management of charging interface plug-in life test system

Share:

With the rapid development of electronic products such as new energy vehicles, smartphones, and wearable devices, the charging interface, as a key connecting component, has a direct impact on the user experience and reliability of the product due to its plug-in life. To ensure product quality and long-term stability, enterprises widely adoptCharging interface plug-in life test systemConduct durability testing. To achieve efficient and accurate testing results, it is necessary to manage the entire process of the system from design to implementation.

1、 Key considerations in the system design phase

In the initial stage of system design, it is necessary to clarify the testing standards and parameter requirements based on the type of product being tested (such as Type-C, Micro USB, fast charging interface, electric vehicle charging port, etc.). Mainly includes:

1. Insertion and unplugging frequency setting: Set the insertion and unplugging frequency per minute according to industry standards or customer requirements;

2. Travel control accuracy: Ensure that each insertion and extraction action is in place to avoid affecting the test results due to positional deviation;

3. Load simulation function: Some systems require integration of current and voltage loading modules to simulate real working conditions;

4. Data collection capability: Configure sensors and software platforms to real-time record key data such as insertion and extraction force, contact resistance, and failure time.

In addition, it is necessary to consider the safety protection mechanism of the equipment, such as emergency stop buttons, anti misoperation design, etc., to ensure the safety and reliability of the testing process.

2、 Quality control during the manufacturing, installation, and commissioning phases

High precision drive components and durable structural materials should be selected for system manufacturing to ensure stability and repeatability during long-term operation. During the installation process, calibration and debugging should be carried out by professional technicians, including:

1. Check whether the mechanical transmission components are flexible and free of jamming;

2. Calibrate the insertion and extraction position and force;

3. Test the accuracy and synchronization of the data collection system;

4. Verify whether the interaction function between the control system and the human-machine interface is normal.

充电接口插拔寿命试验系统.jpg

3、 Test implementation and daily management

After the system is put into use, a comprehensive testing process and management system should be established:

1. Develop standardized operating procedures and train operators;

2. Regular maintenance and inspection of vulnerable parts replacement;

3. Establish testing archives to record sample information, testing cycles, and result analysis for each test;

4. Utilize data analysis tools to optimize testing strategies, improve efficiency and accuracy.

  Charging interface plug-in life test systemThe full process management covers multiple stages from requirement analysis, system design, manufacturing and installation to later operation and maintenance. Only through scientific planning and strict control can the authenticity and effectiveness of test data be ensured, providing strong support for enterprise product research and development, quality control, and market competitiveness enhancement. In the future, with the development of intelligence and automation technology, such systems will continue to evolve towards higher precision and greater data integration.

Copyright © 2025 Demasheng Measurement All Rights Reserved.  Technical Support: Chemical Instrument Network  sitemap.xml

+8675526585726

WeChat

WeChat